Bandar ‘Abbas Mega Hospital

status:

in progress

contract type:

PC

project domain:

building

location:

Iran , Hormozgan

Bandar ‘Abbas Mega Hospital
Contract Type Procurement & Construction
Location Bandar ’Abbas, Iran
Executive Status Under Construction
Physical Progress 80%
Commencement Date Aug., 25, 2018
Initial Duration 30 months
General works’ Quantity
Earth works 75,000 m³
Concreting 35,000 m³
Reinforcement 4,000 tons
Form working 110,000 m²

 

Brief Description

Regarding lack of a general specialized hospital in south of Iran, Bandar ‘Abbas Mega Hospital including capability of providing women and children specialized services with 600 beds capacity, was designed and being under construction by BolandPayeh. This project would lead to increase the average applied bed per 1,000persons from 1.3 to 1.6 in the relevant province which will be closer to the country average (1.9).

 

Technical Specification

The company services in this project consist of: The construction of 32,000 square meters of a concrete structure, The implementation of finishing, ceiling and flooring, walls, doors and windows and procurement and installation of mechanical, electrical and plumbing systems of 55,000 square meters throughout the hospital, The construction of service buildings around the hospital with an area of 5,000 square meter.