_20241229092036.045.jpg)
Contract Type | Construction |
Location | Kermanshah, Iran |
Executive Status | Initial Handover |
Physical Progress | 100% |
Commencement Date | Oct., 2, 2013 |
Initial Duration | 18 months |
General works’ Quantity | |
Earth works | 24,000 m³ |
concreting | 3,000 m³ |
Reinforcement | 250 tons |
Form working | 10,000 m² |
Sliding formwork | 85,000 m² |
Metal works | 1,000 tons |
Brief Description & Technical Specification
Golestan Hospital was designed for the purpose of Burn-Injury with a capacity of 50 beds. The Hospital is considered as a part of nearby Imam Reza Specialized Hospital with the capacity of 600 beds and the “University of Medical Science of Kermanshah”.
The total area of Golestan Burn-Injury Hospital is 8,000 thousand square meters which was designed in 5 levels. The hospital has 22 beds for burn-injury purpose, 11 BICU beds, 8 restoration beds and 9 beds for infectious purpose. The hospital has 2 operation rooms.