| Contract Type | Engineering, Procurement & Construction |
| Location | Tehran, Iran |
| Executive Status | Initial Handover |
| Physical Progress | 100% |
| Commencement Date | Mar., 17, 2009 |
| Initial Duration | 13 months |
| General works’ Quantity | |
| Earth works | 4,000 m³ |
| concreting | 7,000 m³ |
| Reinforcement | 1,000 tons |
| Form working | 25,000 m² |
| Metal works | 1,000 tons |
Brief Description
The Second Air Hanger of Iran Air Co., for Airbus Series A, A300-600, and its annex building in 4 floors with a total area of 36,000 square meters was designed and built by BolandPayeh.
Technical Specifications
General geometry of this Air-Hanger, includes a gate with 59 meters width and a salon with 60*60 meters plan and a height of 20 meters.
The annex has 4 floors with a total area of 36,000 square meters. The structure works includes:
1-Foundation, base slab and truss roof of the Air-Hanger
2-Foundation, wall, beam and slab of the annex building
3-Pump room, water tank, electrical room and façade work
The mechanical, electrical and plumbing works include:
1-Firefighting system (Water and foam)
2-Fire alarm (smoke and fire)
3-Water distribution system
4-Exhaust system and air compressor
5-Electrical panel
6-Lighting and lightning system