Contract Type | Finance, Engineering, Procurement, Construction, Operation & Transfer |
Location | Tehran, Iran |
Executive Status | Under Operation |
Physical Progress | 100% |
Commencement Date | Mar., 3, 2012 |
Initial Duration | 2 years for EPC Works and 9 years for Operation period |
General works’ Quantity | |
Earth works | 700,000 m³ |
Concreting | 35,000 m³ |
Reinforcement | 5,000 tons |
Form working | 200,000 m² |
Brief Description
With the aim of reducing traffic load in the surrounding area of Mehrabad International Airport of Tehran, including Meraj and Airport Boulevard., Jenah, Fath, Sheikh Fazlollah and Lashgari Highways and mainly Azadi Square, the mentioned parking was proposed to be designed and built with a BOT Contract. Mehrabad Airport Car Parking, in front of passengers’ terminal No. 1, was designed and built on a land of 18,000 square meters. The parking was built in 7 levels and a total area of 83,000 square meters.
The related contract was signed between Iran Airport Company (IAC) and BolandPayeh with a BOT format.
The Supervisor of EPC works was “Improvement & Development Organization of IAC” and the supervisor of the operation works was “Mehrabad International Airport”.
Technical Specification
The building of Mehrabad Airport Car Parking has a total area of 83,000 square meters in 7 floors.
With the aim of increasing the capacity of the parking, the slab structure was designed and built as the main parking ramp with 2.5 % slope. The parking is now under operation.