_20241229094029.291.jpg)
Contract Type | Construction |
Location | Isfahan, Iran |
Executive Status | Final Handover |
Physical Progress | 100% |
Date of contract | Jul., 2, 1997 |
Initial Duration | 14 months |
General works’ Quantity | |
Earth works | 200,000 m³ |
concreting | 22,000 m³ |
Reinforcement | 825 tons |
Form working | 76,000 m² |
Metal works | 50 tons |
Brief Description
BolandPayeh scope of work in this contract is all the structural, mechanical, electrical, architectural and civil except roof and façade works of Naghsh-e Jahan Football Stadium, with a capacity of 75,000 seats.
Technical Specifications
Naghsh-e Jahan Football Stadium has an oval shape with two main levels. The capacity of the first level is 42,000 seats and the second level has 33,000 seats. The area of the stadium platform is 103,000 square meters (350×300). The stadium has a specific route of about one kilometer long. The grand stands of the spectators were built by precast concrete members.
The general utilities of the stadium are as follow:
- Specialized Drainage system of the field
- Four entrance gates for the spectators
- Tartan track and field for the Olympic games
- The specific fields for 7 types of sports
- Marathon tunnel of about 110 meters long
- Service and administration area in the “Event Level” of the stadium
including team office area, referee locker rooms, coach locker rooms, 4 sport team locker rooms, 2 disabled team locker rooms, clinic, doping test room, police room and storage room.